Working With a GC

How to Choose a General Contractor for a Multifamily Renovation in Florida

By BellTower Associates Team
How to Choose a General Contractor for a Multifamily Renovation in Florida — article cover image, BellTower Associates

Choosing the general contractor for a multifamily renovation is the single most consequential decision on the project. The finish schedule, the residents' experience, the change-order pattern, and the final delivered quality all trace back to the GC. Price matters, but price is the easiest thing to see and the least predictive of how the project will actually run. Here is what to look for beyond the bid number.

Self-perform capability

The GCs that consistently deliver multifamily renovations on schedule tend to self-perform at least a few core scopes — typically framing, drywall, trim, and finish work, and often site concrete. The reason is control. When the schedule slips because a subcontractor pulled crews to a bigger job, a GC with in-house capacity can backfill without going back to market. A GC that subcontracts everything is entirely dependent on subcontractor availability, and in a tight labor market that dependency is where schedules break.

Self-perform does not mean the GC does everything. Specialty trades — MEP, elevator, roofing, stucco — should be handled by qualified subs the GC has worked with repeatedly. The point is to hold the critical-path finish work close.

Multi-trade coordination experience

Multifamily construction is one of the most trade-intensive project types there is. A single mid-rise stack involves civil, structural, framing, MEP, elevator, drywall, tile, cabinetry, flooring, paint, and site work, and every unit multiplies the coordination load. Ask a prospective GC to walk through how they schedule trades on a similar-sized project. If the answer is generic, the schedule will be generic. If they can talk in specifics about how they hand off drywall to paint to flooring without damage, that is a real answer.

Occupied-property experience

Almost every value-add multifamily renovation is executed with residents in place. That is a completely different discipline than a vacant rehab. Occupied work requires phasing plans that keep amenities and access paths open, notification protocols coordinated with property management, dust and noise control that keeps residents willing to stay, and a punch process that finishes each unit cleanly before the next one starts.

A GC without occupied experience will usually price the job like a vacant rehab and then discover the operational overhead during construction. Ask specifically for references on occupied projects, and ask those references what surprised them.

Trade relationships and subcontractor bench

A GC is only as strong as the subs they bring with them. Ask which subcontractors they intend to use on your project, how long they have worked together, and what happens if a sub is unavailable in the required window. A GC with a shallow bench in your market is exposed the moment their preferred sub is booked.

References — and how to actually use them

Ask for three references on projects that resemble yours in size, sector, and occupancy status. Then ask each reference three questions: did the project finish on the original schedule, did the change-order pattern feel reasonable relative to scope changes, and would you hire this GC again knowing what you now know. Vague positive answers are a signal. Specific answers — even mixed ones — are a signal too.

Ask for a project you can visit. A finished job you can see in person tells you more about a GC than any presentation.

Preconstruction quality

The single best predictor of a smooth build is the quality of the preconstruction work. A GC that produces a detailed, itemized estimate, calls out allowances explicitly, flags scope gaps early, and gives you a defensible schedule before you sign is the same GC that will run the job that way. A GC that hands you a lump-sum number and a promise to "figure it out" is telling you what the change-order pattern will look like.

Licensing, insurance, and financial capacity

  • Confirm the GC holds a current Florida contractor license appropriate to the scope.
  • Verify insurance limits — general liability, workers' compensation, and builder's risk — meet the project requirements.
  • Ask about bonding capacity if a payment or performance bond is expected.
  • Understand the GC's financial position. A GC that runs out of money mid-project is the worst outcome on the list.

Red flags

  • A bid meaningfully lower than the others with no explanation of where the difference comes from.
  • Reluctance to name the specific subcontractors they intend to use.
  • No occupied-property references in a market where occupied work is the norm.
  • A one-page schedule without milestones, submittals, or long-lead items called out.
  • High turnover or unclear responsibility on the project management team assigned to your job.

The bottom line

Hire the GC who is going to run the project you actually have, not the GC who wrote the most confident-sounding proposal. Self-perform capacity, multi-trade coordination discipline, occupied-property experience, subcontractor depth, and preconstruction quality are the levers that decide whether the renovation lands on time and on budget. Everything else is secondary.

Written by BellTower Associates Team.